GoodSam
Well-known member
- Thread starter
- #1
12-23-25 F150 Lightning
2025 Rouge Electrical Vehicle Center July 28, 2025 through October 9, 2025
2026 September 8, 2025 through October 7, 2025
Affected vehicles are identified in OASIS and FSA VIN Lists.
REASON FOR THIS PROGRAM
On some of the affected vehicles, the lower window glass run on the inside of the front doors contained slip coating of insufficient thickness, causing excess friction during glass movement, leading to slow moving or stopped window glass.
SERVICE ACTION
Customer satisfaction P-type programs are to be performed on impacted vehicles already in for other service work (either mobile repair or in dealership). Before delivering any new in-stock vehicles involved in this program, dealers are to replace both front door lower window glass runs. This service must be performed on all affected vehicles at no charge to the vehicle owner.
2025 Rouge Electrical Vehicle Center July 28, 2025 through October 9, 2025
2026 September 8, 2025 through October 7, 2025
Affected vehicles are identified in OASIS and FSA VIN Lists.
REASON FOR THIS PROGRAM
On some of the affected vehicles, the lower window glass run on the inside of the front doors contained slip coating of insufficient thickness, causing excess friction during glass movement, leading to slow moving or stopped window glass.
SERVICE ACTION
Customer satisfaction P-type programs are to be performed on impacted vehicles already in for other service work (either mobile repair or in dealership). Before delivering any new in-stock vehicles involved in this program, dealers are to replace both front door lower window glass runs. This service must be performed on all affected vehicles at no charge to the vehicle owner.
Sponsored
Attachments
-
672 KB Views: 156