I have a 2025 Flash with a 131kWh battery, 8450lb GVWR, and a build date of January 2025.
I had read here and other places that 2025 Flash models had a Job 1 and Job 2 distinction. Job 1 was 131kWh battery and Job 2 was the 123kWh battery.
Does anyone have any information to the contrary? Is...