• Welcome to F150Lightningforum.com everyone!

    If you're joining us from F150gen14.com, then you may already have an account here!

    If you were registered on F150gen14.com as of April 16, 2022 or earlier, then you can simply login here with the same username and password!

Sponsored

Search results

  1. Lightning with Enphase Battery

    Just going to post my testing results… Lightning pro power works in tandem with Enphase battery backup during outage if you set the system to Zero export and have the battery backup/solar started prior to connecting the lightning. This worked with the lightning pro power connected to Enphase...
  2. Pro Power Onboard Unavailable

    I’ve been getting popups about this for a few days and went to test it out. Not working at all. -Screen shows the frunk/interior/box. Frunk and box can hit power on but then after 2sec they go off. Interior power button is greyed out -interior outlets are flashing orange for a fault. There is...
  3. Existing Transfer Switch no Ground

    My shop has an existing neutral switching transfer switch with no ground. It has a nema 10-50 plug for the last owners generator. Do I need to add a ground or can I just get an adapter to nema 14-30?
  4. HIS Multiple Inverters / Larger Solar

    The Delta inverter has a max PV input of 12.5kW I think. I'm planning a solar install of 20kW in an area not serviced by Sunrun. Anyone know if it will be possible to have 2 Delta 9.6kW inverters in parallel. Along with having more solar connected, the home backup could also be 19.2kW?


Top