Stlww18
Well-known member
- Thread starter
- #1
I haven’t seen a definitive guide on this, so I thought I’d put the ones I’ve encountered and people could add to it:
Departed at xxxx scanner: this is the most recent place the rail car has passed through
Intermediate arrival: the rail car is being switched onto another engine at an intermodal terminal
AVPL: available for placement. Your rail car is at its final ramp
PCON: acronym for “constructive placement”. This means NS has delivered the rail car to the ramp but it’s waiting for another car to be unloaded before it can be parked to unload
actual placement: your rail car is parked at a ramp and available to unload
UNLD: unloaded. Your truck is no longer trackable through NS
Departed at xxxx scanner: this is the most recent place the rail car has passed through
Intermediate arrival: the rail car is being switched onto another engine at an intermodal terminal
AVPL: available for placement. Your rail car is at its final ramp
PCON: acronym for “constructive placement”. This means NS has delivered the rail car to the ramp but it’s waiting for another car to be unloaded before it can be parked to unload
actual placement: your rail car is parked at a ramp and available to unload
UNLD: unloaded. Your truck is no longer trackable through NS
Sponsored