Here is a simplified view (but may be inaccurate see * on diagram), and makes sense logically.
- Single AC grid input
- DC to AC output to both load and EVSE (would charge truck when enough solar. Wonder how the amperage is calculated and communicated, i.e. would it start at 30A charging, then drop down when my well pump comes on?)
The transfer switch capacity is 200A which raises a bunch of questions as well. Assuming it is connected to a 200A subpanel, how is that wired?
- Single AC grid input
- DC to AC output to both load and EVSE (would charge truck when enough solar. Wonder how the amperage is calculated and communicated, i.e. would it start at 30A charging, then drop down when my well pump comes on?)
The transfer switch capacity is 200A which raises a bunch of questions as well. Assuming it is connected to a 200A subpanel, how is that wired?