Sponsored

Do I need to run new 400 amp service in my house for the Lightning + everything else?

Kanuck

Well-known member
First Name
Don
Joined
Aug 9, 2021
Threads
4
Messages
274
Reaction score
66
Location
Manitoba
Vehicles
2021 Super Cab Carbonized Grey 3.5 EC 302A 6.5 Box
Occupation
Electrician, Retired
I agree with different charging rates, but with no real metered or monitored data as to what it will be like, other than hear say. Who knows?

One other thought has come to mind, with all the new EV units being sold, will hydro be able to supply the power requirements needed to charge all these EV's or will they have to upgrade the power grid and generator stations? And who will pay for all the upgrades? How long will it take the utility company to do the upgrades as required? Until the upgrades are completed, what will be restrictions placed on my consumption? Everybody that uses hydro will end up paying for the upgrades. That being said, I question why I have to pay a higher rate for my hydro so others can drive EV's.

Where I live, for me to drive from Winnipeg to Calgary (approx 875 miles) with a EV, I am looking at 3 days. That is assuming a range of 300 miles. Not counting reducing in range due to load, driving conditions and weather. With my truck, I can drive it in 14 hours.

I know, I am a shit disturber. Just questions that come to mind and just put out there for discussion.
Sponsored

 
  • Like
Reactions: WRS

RonTCat

Well-known member
First Name
Ron
Joined
Jun 30, 2021
Threads
1
Messages
130
Reaction score
160
Location
USA
Vehicles
Mach-E
Where I live, for me to drive from Winnipeg to Calgary (approx 875 miles) with a EV, I am looking at 3 days. That is assuming a range of 300 miles. Not counting reducing in range due to load, driving conditions and weather. With my truck, I can drive it in 14 hours.
875m/70mph=12.5 hours
20-80% charge=40 minutes (.66hrs)
300*60%charge =180 miles. To get to 875m, need 4 charges
Total time for EV trip = 12.5 + .66*4 = 15.14 hrs

So about an hour and 10 minutes more in an EV. If weather is very cold, you might have to stop for an extra charge or two. Or if you had a couple thousand pounds of stuff in the bed.
 

adoublee

Well-known member
Joined
Aug 30, 2021
Threads
12
Messages
759
Reaction score
700
Location
Midwest
Vehicles
2 EVs
Everybody that uses hydro will end up paying for the upgrades.
Aren't the people buying more electricity paying for the upgrades by purchasing the product being sold? Or, if the entire system is socialized it depends on the where the costs fall in the morality hierarchy and apples for apples fairness is already a non-factor.
 

Kanuck

Well-known member
First Name
Don
Joined
Aug 9, 2021
Threads
4
Messages
274
Reaction score
66
Location
Manitoba
Vehicles
2021 Super Cab Carbonized Grey 3.5 EC 302A 6.5 Box
Occupation
Electrician, Retired
875m/70mph=12.5 hours
20-80% charge=40 minutes (.66hrs)
300*60%charge =180 miles. To get to 875m, need 4 charges
Total time for EV trip = 12.5 + .66*4 = 15.14 hrs

So about an hour and 10 minutes more in an EV. If weather is very cold, you might have to stop for an extra charge or two. Or if you had a couple thousand pounds of stuff in the bed.
that is if you can find a fast charge station somewhere along the road. On the prairies towns a few and far between. Speed limit is 100 km...62 mph. What towns there are on the trans Canada you go through them not around and have to slow down.
 

Sponsored
OP
OP

rjhedrich

Member
First Name
Robert
Joined
Jun 28, 2021
Threads
1
Messages
19
Reaction score
4
Location
Nevada
Vehicles
20 corvette, 14 Sierra, 19 MB S
Occupation
COO
I am the OP and went thru all the steps with multiple lis electric pros and all stated I am capped at 60 amps. So I am capped with the 48 amp charger. I am getting the extended battery which will come with the 80 amp unit. Can I install the 80 amp unit and it will downstep to 48 amps or do I need to sell it.
 

BennyTheBeaver

Well-known member
Joined
Jun 18, 2021
Threads
45
Messages
2,255
Reaction score
2,471
Location
PNW
Vehicles
2023 Lightning XLT ER
I am the OP and went thru all the steps with multiple lis electric pros and all stated I am capped at 60 amps. So I am capped with the 48 amp charger. I am getting the extended battery which will come with the 80 amp unit. Can I install the 80 amp unit and it will downstep to 48 amps or do I need to sell it.
I would sell it and buy the other charger personally. Get a little bit of money back and maximize your available throughput without going overkill. You could put the money back into the truck (tint, custom floor mats...etc).
 
OP
OP

rjhedrich

Member
First Name
Robert
Joined
Jun 28, 2021
Threads
1
Messages
19
Reaction score
4
Location
Nevada
Vehicles
20 corvette, 14 Sierra, 19 MB S
Occupation
COO
I would sell it and buy the other charger personally. Get a little bit of money back and maximize your available throughput without going overkill. You could put the money back into the truck (tint, custom floor mats...etc).
That what I was think too. I can get a good smart 48 amp charger for 500.
 

metroshot

Well-known member
First Name
Pat
Joined
Aug 26, 2021
Threads
97
Messages
2,127
Reaction score
1,754
Location
Montclair, CA
Vehicles
2022 Lariat F150L + 2023 MME
Occupation
Networking Tech

Sponsored

BennyTheBeaver

Well-known member
Joined
Jun 18, 2021
Threads
45
Messages
2,255
Reaction score
2,471
Location
PNW
Vehicles
2023 Lightning XLT ER

sotek2345

Well-known member
First Name
Tom
Joined
Jun 7, 2021
Threads
34
Messages
3,905
Reaction score
4,719
Location
Upstate NY
Vehicles
2022 Lightning Lariat ER, 2021 Mach-e GT
Occupation
Engineering Manager
OP
OP

rjhedrich

Member
First Name
Robert
Joined
Jun 28, 2021
Threads
1
Messages
19
Reaction score
4
Location
Nevada
Vehicles
20 corvette, 14 Sierra, 19 MB S
Occupation
COO

shutterbug

Well-known member
First Name
Joseph
Joined
May 20, 2021
Threads
12
Messages
1,301
Reaction score
1,290
Location
Phoenix
Vehicles
MME GB FE—Dead. F150L Lariat SR. MME Rally.
This the one I am going with Emporia Smart Electric Vehicle (EV) Charger | Up to 48 Amp | Level 2 WiFi Enabled EVSE | NEMA 14-50 or Hardwired | Indoor/Outdoor Charging Station | 24-Ft Cable
It isn't currently UL certified. I think they are working on that, but I would personally stick to those that have been certified.
 

personalt

Well-known member
First Name
Rich
Joined
Oct 8, 2021
Threads
6
Messages
121
Reaction score
67
Location
NJ
Vehicles
Tacoma / Cayenne
i am op and have had two electrical contractor review my current set up . Using the nerc rules I don’t have the headroom in my current set up. I have 200 service to my house and my house mostly electric with two 5 ton ac units, electric stove, double oven , washer dryer and pool pump i have head room for 48 amp charger only . The only way I can get the 80 amp which needs headroom of 100 I would have to run a 400 run from the street. The cost been quote $15,000 to $18,000 and that not in the budget. I wanted the platinum ext battery is able to be charged with a 48 charger . I assume I would loose the automatic back up to the house. I just looking for directions.
Did any of these contractors put an AMP meter on the panel and have you run 'all your stuff?' If not they are just guessing. (Unless they went around the whole house and wrote down the values from all the appliance plates and counted lights). You can get a really good idea of usage yourself with a clamp meter for $20 from home depot. Pull the cover, put the clamp meter on one side, turn on the max stuff you think you might run and see what the usage is
Sponsored

 
Last edited:
 







Top