Most likely if your current panel is limited to 100A, the service wire from the meter to the panel and the wire from the transformer to the meter are both only sized for 100A. If this is the case, it is most likely better to just add a second 100A meter that feeds a new panel with 100A breaker that feeds the vehicle charger. This would be better than ripping into the current service for the house and allows for using a meter that charges one rate during the day and a lower one at night when it is best to charge the vehicle. I went to a meter for my 200A service that charges based on time of day and the savings for charging the car at night were more than offset by paying higher rates during the day on all other electricity usesThe diagram is very crewed but I don't think you can justify the statement that the intent of the diagram doesn't meet the electrical code. It's very likely that the meter is already rated for 200 amps but of course you would have to do your homework to be sure. And as far as the feeders from the meter go, you are going to have to replace those anyway to get the transfer switch/EVSE in there.
Sponsored