hturnerfamily
Well-known member
- First Name
- William
- Joined
- Jan 8, 2022
- Threads
- 50
- Messages
- 2,472
- Reaction score
- 3,206
- Location
- rural Georgia
- Vehicles
- 22 LIGHTNING PRO IcedBlueSilver 8/23/2022
- Occupation
- Owner
a permit is also not simply a piece of paper to pay a 'tax' for remodeling or similar work,
but entails many people working on your behalf to stay within the rules, codes, laws, etc.,
as well as provide for competent work layout/installation/equipment...
- an 'engineer' to look over the work and make sure it is legit, legal, up to code, and within ordinances
- an onsite 'inspector' to view the work, first hand, to make sure it is within the engineering and permit scope, with sometimes 'multiple' trips to the site...
- office workers to process the permit, get it to the right department, and handle payments, etc., and customer service to handle 'complaints' from contractors and homeowners, of course!
no, none of us 'like' the process, or the requirement, but, I suppose we can all appreciate why these things are in place, even if it seems overly costly for such 'simple' work. Yes, it is also VERY different, process and price wise, across the country. Some places actually have NO permit requirements.
I've been there, done that.
In a rural area, I simply called the utility to come hook up my new pole, with newly DIY installed Main Panel and weatherhead... it was done the next day.
In another county, next door, in another rural area, I had no less than 3 permits, with two different inspectors, a decline, and a final 'o.k.' to my DIY pole, main panel, and weatherhead... and it took over a week, and certainly a few dollars. : /
but entails many people working on your behalf to stay within the rules, codes, laws, etc.,
as well as provide for competent work layout/installation/equipment...
- an 'engineer' to look over the work and make sure it is legit, legal, up to code, and within ordinances
- an onsite 'inspector' to view the work, first hand, to make sure it is within the engineering and permit scope, with sometimes 'multiple' trips to the site...
- office workers to process the permit, get it to the right department, and handle payments, etc., and customer service to handle 'complaints' from contractors and homeowners, of course!
no, none of us 'like' the process, or the requirement, but, I suppose we can all appreciate why these things are in place, even if it seems overly costly for such 'simple' work. Yes, it is also VERY different, process and price wise, across the country. Some places actually have NO permit requirements.
I've been there, done that.
In a rural area, I simply called the utility to come hook up my new pole, with newly DIY installed Main Panel and weatherhead... it was done the next day.
In another county, next door, in another rural area, I had no less than 3 permits, with two different inspectors, a decline, and a final 'o.k.' to my DIY pole, main panel, and weatherhead... and it took over a week, and certainly a few dollars. : /
Sponsored