Sponsored

Disconnecting the 12V Battery to "fix" a problem - BMS Learned Values Reset

Mike G

Well-known member
First Name
Mike
Joined
Jan 6, 2022
Threads
32
Messages
1,859
Reaction score
2,739
Location
N. AL, USA
Vehicles
2022 F-150 Lightning, 2023(J1) Mach-E GT-PE, '24 Bronco HLE 2Dr
There have been discussions on the forum where the suggestion has been made to disconnect the 12V battery in order to "reset" some function of the vehicle that was not performing properly (TCU comes to mind for the '23 model owners). I realize that disconnecting the 12V battery is probably easier than finding the fuse for the offending module and just pulling that for a few minutes instead.

But it may be creating a different problem. There is a Battery Monitoring System (BMS) that keeps track of your 12V battery status and lets the BMS know when the battery is fully charged. Disconnecting the 12V battery can screw up the "learned values" in the BMS and then your 12V battery may not fully charge after that.

The fix for this issue is simple and techs are told to do this everytime they replace a battery or the FDRS program they use indicates that the battery state-of-charge is too low. It's a procedure that can be done in FDRS or with this simple routine that can be done before the next time you take a drive.

Press the start button without stepping on the brake (Accessory mode).

Flash the highbeams with the stalk 5 times, and then step on the brake pedal 3 times, and after that check the red battery icon on the instrument panel to see that it flashes three times.

And then press the start button again to turn the truck off.

And then you can turn the truck fully on and drive off. Your 12V battery should then fully recharge.
Sponsored

 

RickLightning

Well-known member
Joined
Jan 17, 2022
Threads
113
Messages
7,135
Reaction score
9,796
Location
SE MI
Vehicles
'22 Lightning ER Lariat,'22 Mach-E Premium 4X
I mentioned the battery disconnect to a Ford engineer while discussing my recent lack of GPS issues, i.e. I did the battery disconnect to try and fix the problem (didn't help, needed new coax splitter).

The comment I got back was as follows:

"Don't pull the negative. ...someone who did that and brick their car because it was doing an OTA."
 

Gimme_my_MME

Well-known member
Joined
May 29, 2022
Threads
2
Messages
658
Reaction score
1,257
Location
Dearborn
Vehicles
Grabber Blue First Edition Mustang Mach-E
Occupation
Engineer
Like all things there are risks to this. Like Rick said if you kill 12v during an OTA you will brick the truck. It is fixable at a dealer but if you are pulling the 12v you are probably doing it to avoid the dealer to begin with.
The other risk is if you actually have a low 12v and reset your BMS it will have an incorrect baseline. You will then have an increased risk of the vehicle not keeping the 12v charged enough and might strand you. Granted the 12v shouldn't be that degraded on a truck so new that you have this issue, it's just one of those possible issues
 

MickeyAO

Well-known member
First Name
Mickey
Joined
Apr 2, 2020
Threads
27
Messages
1,063
Reaction score
2,144
Location
San Antonio Tx
Vehicles
Rapid Red Lightning Lariat ER, Kia EV6 GT-Line AWD
Occupation
Retired Lab Manager of the Energy Storage Technology Center
The fix for this issue is simple and techs are told to do this everytime they replace a battery or the FDRS program they use indicates that the battery state-of-charge is too low. It's a procedure that can be done in FDRS or with this simple routine that can be done before the next time you take a drive.

Press the start button without stepping on the brake (Accessory mode).

Flash the highbeams with the stalk 5 times, and then step on the brake pedal 3 times, and after that check the red battery icon on the instrument panel to see that it flashes three times.

And then press the start button again to turn the truck off.

And then you can turn the truck fully on and drive off. Your 12V battery should then fully recharge.
How do I do this through FDRS?
 

Sponsored

carys98

Well-known member
First Name
Cary
Joined
Jan 15, 2022
Threads
32
Messages
884
Reaction score
1,419
Location
Raleigh, NC
Vehicles
2023 Lightning Lariat SR
Occupation
Retired EE
Like all things there are risks to this. Like Rick said if you kill 12v during an OTA you will brick the truck. It is fixable at a dealer but if you are pulling the 12v you are probably doing it to avoid the dealer to begin with.
The other risk is if you actually have a low 12v and reset your BMS it will have an incorrect baseline. You will then have an increased risk of the vehicle not keeping the 12v charged enough and might strand you. Granted the 12v shouldn't be that degraded on a truck so new that you have this issue, it's just one of those possible issues
I have previously disconnected the negative, charged the battery fully, and then reconnected and reset the BMS. Is this the recommended procedure? Right after I did that I was able to consistently get over 90% but now it stays in the 60s and maxes out around 83%. Should I repeat that procedure? I strongly suspect that my battery is faulty but the dealer tested it and claimed it is OK.
 

Gimme_my_MME

Well-known member
Joined
May 29, 2022
Threads
2
Messages
658
Reaction score
1,257
Location
Dearborn
Vehicles
Grabber Blue First Edition Mustang Mach-E
Occupation
Engineer
I have previously disconnected the negative, charged the battery fully, and then reconnected and reset the BMS. Is this the recommended procedure?
That is perfect.

Right after I did that I was able to consistently get over 90% but now it stays in the 60s and maxes out around 83%. Should I repeat that procedure? I strongly suspect that my battery is faulty but the dealer tested it and claimed it is OK.
Your battery is ok, it is the BMS falsely causing these issues
 

azypather

Active member
First Name
Azy
Joined
Jan 9, 2023
Threads
0
Messages
35
Reaction score
16
Location
Navarre, FL
Vehicles
2017 Merc GLe 350, 2018 VW Golf SE, 2023 F150 - L
Occupation
IT Consultant
My OTA updates are failing, apparently due to a "Low 12V Battery charge" error per Ford. I don't see this message but that's what they tell me shows up on their end. They recommended me taking it in to the dealer. I will try this to see if it fixes the issue
 
OP
OP
Mike G

Mike G

Well-known member
First Name
Mike
Joined
Jan 6, 2022
Threads
32
Messages
1,859
Reaction score
2,739
Location
N. AL, USA
Vehicles
2022 F-150 Lightning, 2023(J1) Mach-E GT-PE, '24 Bronco HLE 2Dr
How do I do this through FDRS?
It's a BCM tool. Fastest way to find it is to type "learned" in the search box on the top right of the toolbox page to filter for it. Below is where it is in the full list of tool routines filtered for just BCM related items.

Ford F-150 Lightning Disconnecting the 12V Battery to "fix" a problem - BMS Learned Values Reset Lightning_BMS_Learned_Values_Reset
 

carys98

Well-known member
First Name
Cary
Joined
Jan 15, 2022
Threads
32
Messages
884
Reaction score
1,419
Location
Raleigh, NC
Vehicles
2023 Lightning Lariat SR
Occupation
Retired EE
.

And then press the start button again to turn the truck off.

.
I think I may have solved my problem. The step highlighted above is very important (@Mike G or @Gimme_my_MME can you confirm?). I believe in the past I was immediately starting the truck after the battery icon flashed 3 times instead of powering off. I charged the battery overnight and followed the instructions to the letter this morning and I am now showing 100% SOC.
 

Sponsored
OP
OP
Mike G

Mike G

Well-known member
First Name
Mike
Joined
Jan 6, 2022
Threads
32
Messages
1,859
Reaction score
2,739
Location
N. AL, USA
Vehicles
2022 F-150 Lightning, 2023(J1) Mach-E GT-PE, '24 Bronco HLE 2Dr
Another downside to completely disconnecting the 12V battery is (according to the service manual) before you do that you are supposed to first de-energize the high-voltage battery system....and then after you reconnect the 12V battery on a truck that has one-touch windows you're supposed to perform the window motor initialization.

So how many of you out there de-energized your HV battery pack before disconnecting the 12V battery?

...yeah that's what I thought... :cool:
 

Attachments

Cooperstruck

New member
First Name
Scott
Joined
Oct 28, 2024
Threads
0
Messages
1
Reaction score
2
Location
Missouri
Vehicles
F150 Lightning
Occupation
Engineer
There have been discussions on the forum where the suggestion has been made to disconnect the 12V battery in order to "reset" some function of the vehicle that was not performing properly (TCU comes to mind for the '23 model owners). I realize that disconnecting the 12V battery is probably easier than finding the fuse for the offending module and just pulling that for a few minutes instead.

But it may be creating a different problem. There is a Battery Monitoring System (BMS) that keeps track of your 12V battery status and lets the BMS know when the battery is fully charged. Disconnecting the 12V battery can screw up the "learned values" in the BMS and then your 12V battery may not fully charge after that.

The fix for this issue is simple and techs are told to do this everytime they replace a battery or the FDRS program they use indicates that the battery state-of-charge is too low. It's a procedure that can be done in FDRS or with this simple routine that can be done before the next time you take a drive.

Press the start button without stepping on the brake (Accessory mode).

Flash the highbeams with the stalk 5 times, and then step on the brake pedal 3 times, and after that check the red battery icon on the instrument panel to see that it flashes three times.

And then press the start button again to turn the truck off.

And then you can turn the truck fully on and drive off. Your 12V battery should then fully recharge.
Thanks Mike! That cleared all the error messages I was getting!!!
 

rogerfranzis

New member
Joined
Mar 7, 2025
Threads
0
Messages
3
Reaction score
0
Vehicles
2022 Pro ER
I have previously disconnected the negative, charged the battery fully, and then reconnected and reset the BMS. Is this the recommended procedure? Right after I did that I was able to consistently get over 90% but now it stays in the 60s and maxes out around 83%. Should I repeat that procedure? I strongly suspect that my battery is faulty but the dealer tested it and claimed it is OK.
Hey guys, on my '22 Pro ER I had a bunch of warnings in the middle of driving, to the point where the motor completely disengaged without any power in the accelerator. Once I got home after a few on/off tries, parked and turned the car off, then came back a bit later, no errors were present and the vehicle was driving just fine. I'm afraid the issue will occur again so I tried disconnecting just the negative, reconnecting, and performing the BMS reset by power on, 5 high beams, 3 brake pedal presses, wait (no flash from battery icon), power off. Questions:

1. Is this procedure still supposed to work? I'm not getting the red battery icon to flash, it just stays on from the moment I turn on the accessory power. Is the reset only doable after full 12V disconnect?

2. When you said you disconnected the negative, was it Just the negative or positive as well?

3. What's an easy way to test the 12V battery? I have an OBD reader I can connect to my phone, haven't tried it yet. 12V outlet based USB adapter reads 12.3V when vehicle is off and 13+ when it's on.

4. If it turns out the 12V battery is bad, do other stores sell them or only Ford? Checked AutoZone website and got 0 results for the vehicle. When I asked a local Ford service advisor, he sounded hesitant and said something along the lines of inventory software doesn't show we have them in stock but if you bring the car and if it seems that a new 12V is needed, we'll get one, even from O'Reilly or something. Then he advised me that programming would be needed so I should stay away from replacing it myself. :)

Thank You
 
Last edited:

carys98

Well-known member
First Name
Cary
Joined
Jan 15, 2022
Threads
32
Messages
884
Reaction score
1,419
Location
Raleigh, NC
Vehicles
2023 Lightning Lariat SR
Occupation
Retired EE
Hey guys, on my '22 Pro ER I had a bunch of warnings in the middle of driving, to the point where the motor completely disengaged without any power in the accelerator. Once I got home after a few on/off tries, parked and turned the car off, then came back a bit later, no errors were present and the vehicle was driving just fine. I'm afraid the issue will occur again so I tried disconnecting just the negative, reconnecting, and performing the BMS reset by power on, 5 high beams, 3 brake pedal presses, wait (no flash from battery icon), power off. Questions:

1. Is this procedure still supposed to work? I'm not getting the red battery icon to flash, it just stays on from the moment I turn on the accessory power. Is the reset only doable after full 12V disconnect?

2. When you said you disconnected the negative, was it Just the negative or positive as well?

3. What's an easy way to test the 12V battery? I have an OBD reader I can connect to my phone, haven't tried it yet. 12V outlet based USB adapter reads 12.3V when vehicle is off and 13+ when it's on.

4. If it turns out the 12V battery is bad, do other stores sell them or only Ford? Checked AutoZone website and got 0 results for the vehicle. When I asked a local Ford service advisor, he sounded hesitant and said something along the lines of inventory software doesn't show we have them in stock but if you bring the car and if it seems that a new 12V is needed, we'll get one, even from O'Reilly or something. Then he advised me that programming would be needed so I should stay away from replacing it myself. :)

Thank You
1. The reset should work but if you do it when the battery is not fully charged it will not have a correct SOC value. It will eventually learn the correct value. To get an accurate reset you need to disconnect the negative, put it on a charger and fully charge it, and then do another reset.

2. Yes, just the negative.

3. An OBD reader will show the SOC for the 12V but since you just did a reset it may be off. The problem is that most battery tests are looking at cold cranking amps but that doesn’t mean anything for an EV. The test we need is capacity and that takes different equipment and much longer to test. The dealers haven’t figured this out yet.

4. We use a group H3 AGM battery. Advance has a DieHard battery available that has a slightly higher capacity (40Ah) than the OEM battery. There are probably others.
https://shop.advanceautoparts.com/p...m=h3+battery&selectedFulfillment=store_pickup

Did you check the BMS module to be sure it isn’t one of the faulty ones that was covered under CSP23B70? That CSP has expired so if you have a faulty one you will have to buy the replacement but it’s only about $30. If you have the part number in the top picture you need to replace it with the one on the bottom. That solves many problems related to the 12V.

Ford F-150 Lightning Disconnecting the 12V Battery to "fix" a problem - BMS Learned Values Reset A113497C-F851-4310-A02C-1C3FB96E532A
 

rogerfranzis

New member
Joined
Mar 7, 2025
Threads
0
Messages
3
Reaction score
0
Vehicles
2022 Pro ER
1. The reset should work but if you do it when the battery is not fully charged it will not have a correct SOC value. It will eventually learn the correct value. To get an accurate reset you need to disconnect the negative, put it on a charger and fully charge it, and then do another reset.

2. Yes, just the negative.

3. An OBD reader will show the SOC for the 12V but since you just did a reset it may be off. The problem is that most battery tests are looking at cold cranking amps but that doesn’t mean anything for an EV. The test we need is capacity and that takes different equipment and much longer to test. The dealers haven’t figured this out yet.

4. We use a group H3 AGM battery. Advance has a DieHard battery available that has a slightly higher capacity (40Ah) than the OEM battery. There are probably others.
https://shop.advanceautoparts.com/p...m=h3+battery&selectedFulfillment=store_pickup

Did you check the BMS module to be sure it isn’t one of the faulty ones that was covered under CSP23B70? That CSP has expired so if you have a faulty one you will have to buy the replacement but it’s only about $30. If you have the part number in the top picture you need to replace it with the one on the bottom. That solves many problems related to the 12V.

A113497C-F851-4310-A02C-1C3FB96E532A.jpeg
Thanks. BMS module PN ends in BA, so looks like it's already been revised.

Does the fact that I don't get the three flashes from red battery icon indicate that BMS reset is Not happening? I did hear a split second random sound/noise about 45 seconds after I pressed the brake pedal 3 times, but that was it. Also noticed that the button located on the frunk now does not open or close it but the button to the left of the steering wheel works. Will check again after driving.
Sponsored

 
 







Top