Its PJ Bia
Well-known member
Looking at other threads/spreadsheets, seems like it takes 10-15 days on average for the built status to pop, depending on if your build is on a chip hold (not sure how to check this)I've been trying to catch up on this thread, but how long was the average wait between blend date to built status to receiving a shipping notice?
Sponsored