Highpi
Well-known member
- Thread starter
- #16
So, Ford doesn't cover the permit or are you saying Qmerit may double charge and keep the difference?Hopefully the installer can install the FCSP on a 60 amp circuit with that 100a sub panel. They should do a load calculation and compute if the panel can accommodate another 60 amp circuit. They also should pull a permit and have building inspector approve it at your cost. Some have reported that Qmerit will charge you for permit cost and administration fee to create, apply and finalize the permit.
Report back with your experience.
Sponsored